ADM.11:4.1 - Recover the promised condition and actual undertakings

Name the recipient’s condition, scope, time and completion evidence. Recover who has undertaken to supply or arrange it and under which terms. Distinguish the desired target and expected result from what a provider has undertaken. Use OPS.13 if the promise itself needs to be established.

Identify the provider contributions needed to supply the condition or establish whether it can be supplied. Use existing assignments, permissions and adequate decisions from ADM.2–ADM.3 and ADM.8. An unassigned future provider is a proposal, not available capacity or a current undertaking.

If nobody has undertaken to resolve a combined-service failure, identify the missing assignment or commitment. Take that question to the holder of the assignment authority when known. A proposed coordinator needs an effective assignment before the service can rely on that responsibility.