Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:20:05 UTC

A.7.1:7 - Conformance Checklist

IDCheck
CC-A7.1-1The use names one engineering result, guarantee, smallest disputed claim, and consequence failure.
CC-A7.1-2One grounded defeated reading can trigger the method; fabricated alternatives are not required.
CC-A7.1-3The work enters the first capable domain, wording, typed-account, or constructive-ground locus rather than a mandatory ladder.
CC-A7.1-4The normal case uses the already selected A.7.1 analysis method as its one apparatus; the engineering subject and its subject pattern remain inputs and constraints. Candidate generation and choice open only for alternative direct-kind apparatuses eligible for the same use and guarantee.
CC-A7.1-5Keep the reader, description episteme, Method and problem-facing result distinct. A MethodDescription claim satisfies A.3.2; an asserted dated Work uses the independent A.13/A.15.1 basis in §0, with F.6 only for the precise attribution consumed. Local system-role-kind classification and the obtaining assignment remain separate claims.
CC-A7.1-6Cite only load-bearing A.7.CP claims; identify their reasoning-basis occurrences when the receiving use needs the reliance account under §4.4.
CC-A7.1-7Direct relation, local system-role-kind, assignment, state, capability, responsibility, evidence, source-use, Work, and kind-admission patterns remain authoritative.
CC-A7.1-8The result uses one declared local disposition and includes stop/reopen or blocker.
CC-A7.1-9A saved ontology result serves reuse, dispute, consequence, automation or cross-pattern change. Any new framework-pattern or U-kind proposal satisfies its applicable admission; saving a local distinction does not itself open that proposal.
CC-A7.1-10No provisional branch presentation is treated as an admitted CGUS.