Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 23:15:20 UTC

A.6.S:4.6 - State during construction (informative)

Use an existing edition or status distinction when it answers the construction question. A different state claim needs its own definition; a convenient label does not admit a kernel kind. In most cases, use:

  • edition + explicit continuity/withdrawal links for semantic evolution, and
  • a coarse status (Draft/Review/Stable/Deprecated) for process signalling.

If a project needs a reusable state-change policy, place it in the applicable signature’s declared content or in a separately identified policy episteme, according to its EntityOfConcern and use. A one-off status change is stated directly. Where state-change policy is normative, express it as a status or state-transition policy for the relevant signature episteme or publication under its effective scheme and ClaimScope, with A.2.4 and F.10 status-use discipline and A.6.5 slot discipline where needed. Do not call the episteme’s status a system role or create a system-role assignment for it; use E.10.ROLE to route bare role wording to the status, state, declaration position, or other direct branch.