A.6.P.WMR:4.8 - Work-name grounding by morphology and occurrence
An action nominal such as testing, assembly, maintenance, evaluation or inspection does not identify an occurrence by its morphology. Recover what it names under the applicable subject rule: for example, an admitted Method, a MethodDescription about that Method, a plan item, a required effect or a performed Work. Use A.6.F when function-like wording still hides its object or relation; that pattern distinguishes the transformation, structure, view, capability and other functional claims. A WBS element or Work Package ordinarily describes intended work; an actual occurrence needs its own basis.
A use that needs only the recovered method, method description, plan, structure, or other already governed value closes under that direct pattern. Only reliance on the label as one performed occurrence handles the candidate designation and required granularity under A.15.1.
For a deliberately asserted particular Work occurrence, recover its A.13 basis and apply A.15.1 independently. Use the established Work at the needed granularity, a supported neighboring object, or the stated blocker. A material workContinuityPolicyRef belongs to the A.15.1 identity judgement. If the sentence additionally attributes Work to an assignment, use F.6 with that same A.13 assignment; missing or contrary attribution facts alone do not erase independently admitted Work. Recheck any admission premise invalidated by the same finding and its dependent conclusions under A.15.1. Apply F.18 only after the occurrence is established and needs a durable name.
Any output, result, outcome, production, delivery, or acceptance wording is a separate WMR claim only while its direct relation or claim dimensions remain hidden. Once readable, apply the rule for that relation or claim; it does not become part of work identity.
The preceding action-nominal classification is an FPF-scoped synthesis from recurring morphology-and-subject ambiguity, not a rule imported from PMI, PRINCE2, IDEF0, or IDEF3. A domain may conventionally use an action nominal as the durable name of an already grounded method, plan item, functional-view record, or dated work occurrence; that direct identity and predicate win over morphology. The synthesis reopens if repeated practice shows that the cue classifies a directly grounded value under the wrong predicate family, or if a trigger case cannot close through A.6.F, the subject predicate, or A.15.1 without new ontology.
| Planning or description lineage | Bounded use here | Prohibited inference |
|---|---|---|
| PMBOK WBS practice | Its deliverable-oriented naming pressure is used only to recognize that WBS elements and Work Packages are often named from expected deliverables. | The named plan element proves no dated occurrence, enacted method, actual participant, produced entity, result, or outcome. |
| PRINCE2 7 public Foundation page | Its description of seven broad project-management practices supplies a vocabulary comparison. Detailed product, product-description, activity and Work Package distinctions need their own official source. | The page alone supplies neither those detailed distinctions nor FPF occurrence identity, production, delivery or acceptance facts. |
| IDEF0 historical recognition lineage (non-authoritative here) | A box label remains source-side function-model wording. A still-hidden FPF claim requires A.6.F; otherwise the label names the already recovered required-transformation or required-effect claim, actual U.Transformation, functional-view record, method description, TransformationFlowStructure locus, or other exact governed value under its direct pattern. | This lineage supplies no positive FPF kind inference: neither box form nor function wording identifies U.Function or supplies identity evidence for a performed Work occurrence admitted under U.Work. |
| IDEF3 Units-of-Behavior historical recognition lineage (non-authoritative here) | The terminology remains only as wording that may occur in inherited process descriptions. | This lineage supplies no positive FPF kind or relation inference; a Unit-of-Behavior description or label is never identity evidence for a dated Work occurrence admitted under U.Work. |
Inspection contrast. inspection method names the way of doing. planned Pump-14 inspection work is intended-work content. Pump-14 inspection on 2026-07-15 09:10-09:34 becomes a performed occurrence only when applying A.15.1 establishes it at the required granularity; otherwise retain the lowered object or blocker. If the current question is whether the work first constituted an inspection-report episteme, apply A.15.PROD and use its local entity-identity-inception claim or branch blocker. A measured or diagnostic result uses its direct result rule, and a pass/fail verdict remains a separately governed evaluation-result episteme rather than the inspected entity or a downstream effect.