Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

A.6.F:4.8 - Worked slices

Function-like module claim; no direct relation. A release note says, “The brake-control functional package is in the vehicle-control system.” The receiving question asks what interface BrakeControllerPackage presents in Release-2026Q2 under BrakeControlInterfaceSpec-v5. That question selects the module-interface claim; the adjective functional alone selects neither that claim nor a new U.Function kind. Recover:

  • exactGovernedObjectOrClaim: A.6.M ModuleInterfaceClaim content naming BrakeControllerPackage, VehicleControlSystem, Release-2026Q2, VP.ModuleInterface, BrakeControlBoundary, and an interfaceSpecificationRef that resolves BrakeControlInterfaceSpec-v5; its direct-relation disposition is noDirectRelationClaimed;
  • selectedClaimBearingEpistemeUse: BrakeArchitectureNote_v3 : U.Episteme under C.2.1 carries that content and has BrakeControllerPackage as its EntityOfConcern;
  • directRelationPredicateUse, relationalAssertionUse, and obtainingRelationOccurrenceUse: not used, because no domain rule has admitted a direct module relation predicate or an obtaining occurrence for this case;
  • remaining action: apply A.6.M to the declared interface and admissibility conditions; do not infer a function allocation, direct relation, or implemented compatibility from the source phrase.

Interrupted assignment; occurrence identity needed. A maintenance log says, “Robot-7 resumed its inspection function after a documented period with no inspection assignment.” Treat function as a cue. Recover InspectorSystemRole and one declared direct species CellInspectorAssignment <: U.SystemRoleAssignment; then test its direct predicate for Robot-7 : U.System and the species-specific cell and interval participants. Keep Robot7AssignmentLog_42 as the separate C.2.1 episteme that states the interval facts. Evidence of renewed inspections may establish that Work while the later assignment is still open. If the log and current assignment rule establish an assignment before the gap and its establishment again afterwards, A.2.1 identifies two occurrences. When that history matters, use A.6.REL with the identity rule to distinguish InspectorAssignment_PreGap and InspectorAssignment_PostGap. A taxonomy or scheme is not an assignment participant, and neither assignment implies inspection Work.

Neighbor claims that need their own relation.

  • TestArticle-7 participates passively in TestWork-9 during TestInterval-9 is not established by TestArticleSystemRole or TestArticleAssignment-7. Until a direct passive-test-participation predicate supplies participant order and identity, return A.6.RCD missing-governor[direct passive-test-participation relation]; the tester’s Work and F.6 attribution remain usable.
  • For Motor-M1 drives PumpAssembly-A during PumpRun-17, the operating question is whether this motor transmitted driving torque to the pump in that run. The assignment identifies the intended drive. A measurement of the direction and transfer of torque through M1’s engaged coupling during pumping can identify the active drive. A discharge reading alone leaves the motor open if a second drive could supply the same flow. For a formal claim that needs an admitted direct motor-drive relation, an absent rule leaves A.6.RCD missing-governor[direct motor-drive-functioning relation].
  • Hammer-3 supports PaperStack-9 during Interval-P needs a direct artifact-support predicate. Do not replace that claim with an interchangeable list of use, load, support, or function kinds; without the predicate return A.6.RCD missing-governor[direct artifact-support relation].

Functional architecture phrase. A team says, “the functional architecture is the user journey.” A.6.F does not let the phrase create a separate architecture kind. For a receiving use that needs inspectable detail, the repair can be recorded as:

FunctionUseRepair:
phrase: "functional architecture"
functionLikeReadingUnderRepair: functionalArchitecture
exactGovernedObjectOrClaim: the `ArchitectureOf@Context` claim record and its one selected functional `U.Structure`
selectedClaimBearingEpistemeUse: the `ArchitectureStructuralView` episteme whose `EntityOfConcern` is that structure, plus any C.2.1 `FunctionalElementClaim` epistemes cited by the use
subjectPatternApplicationRefs: C.30; C.30.ASV
blockedLocalOverreadRefs: the source claim "the functional architecture is the user journey"
nextAdmissibleUse: when the view changes action, use `FunctionalStructureViewUse` to cite the view, claim epistemes, and only separately established bearer, capability, port, allocation, or correspondence values
stopCondition: ordinary phrasing remains Plain when no architecture claim is made; requirement-only material remains a claim; an actual transformation appears only on an independent A.3.4 basis

Functionality as quality. A product note says, “new functionality improves adequacy.” The repair separates the added-capability or required-effect claim from the quality claim. Capability or effect wording may stay as recognition, but the adequacy claim goes to C.25, C.16, C.16.Q, or the admitted characteristic or measurement pattern that states its bearer and criterion. A.6.F stops once those claims and subject patterns are clear; it adds no reusable declaration, view, or representation apparatus unless the receiving use needs it.

Mathematical function or loss. A model note says, “the loss function explains the holon purpose.” The repair keeps the mathematical function under C.29 lens discipline: domain, codomain or relation domain, preserved and lost structure, lens-use admissibility value, and stop condition. The loss may inform a reasoning move; it does not become holon purpose, evidence sufficiency, causal proof, assurance, or project decision by itself.

Pump-station functional dependency. A maintenance note says “the backup pump function is degraded.” The service requires flow to resume within two minutes after the duty pump stops. The installed reserve has adequate capacity once running. With the proposed change it first comes on line after five minutes, with no other supply during that interval. The proposed arrangement fails the recovery requirement even if its normal flow is unchanged. To decide which pump supplied yesterday’s flow, use evidence of that run. To decide whether the former arrangement met the requirement, establish its own recovery conditions. The note can also raise distinct questions about allocation, capability, the maintenance performed or the quality being assessed.

Product-platform allocation. A hardware team says, “thermal management functionality moved to the chassis.” The repair separates required heat-removal effect, module allocation, interface constraints, signature constraints, architecture structural view, and any evidence or gate claim. A.6.F keeps the function-like wording useful for architecture work while sending module-interface and evidence claims to their subject patterns.