A.6.B:8.4.4 - Example 2 — Mechanical engineering (fit / coaxiality)
A.6.B:8.4.4.1 - Draft sentence (non-conformant)
“This fit ensures coaxiality.”
A.6.B:8.4.4.2 - Atomize + Classify
First recover which assertion ensures is meant to express. In this constructed case, a reader initially needs to interpret the geometric requirement at the shaft–bushing boundary. The author obtains the declared datum, tolerance and measurement convention, then uses steps 2–3 of §4.4 to select the two definitions that make that requirement interpretable:
L-FIT-01 (Definition).
coaxiality is defined relative to a declared base axis and measurement method (datum scheme, instrument, tolerance zone).
(Truth-conditional: “what it means”.)
L-FIT-02 (Interface and boundary structure). The boundary relation involves shaft, bushing, datum axis, tolerance class, temperature window, assembly procedure class. (Signature-level arity recovery / slots.)
Return to the interpretation question. The author writes: “Interpret the coaxiality requirement for the shaft–bushing boundary using its declared datum scheme, measurement method and tolerance zone (L-FIT-01), with the participants and applicable temperature and assembly conditions in L-FIT-02.” The reader can now locate what the geometric requirement means. A measured claim about a particular lot needs a further answer.
Changed question: determine what was established for lot L123. The author obtains the evaluation rule and the dated measurement facts. The admissible process envelope and actual evaluation connect the geometric meaning to this lot. Their source recovery supplies the next three claims:
A-FIT-01 (Gate predicate). In this expanded case, the evaluation mechanism admits assessment of the coaxiality claim only when manufacturing and assembly satisfy the declared process envelope: material batch, temperature window, tool calibration validity, surface finish class and alignment procedure version. (Gate predicate; can be checked using evidence, but is not itself evidence.)
E-FIT-01 (Evidence carriers).
For CoaxialityEvaluation-L123 over lot L123 and Γ_time=[t1..t2], carriers CMMReport-L123, CalibrationCertificate-C7, AssemblyLog-L123, TemperatureTrace-L123, and DatumSchemePin-D4 were produced or observed. An A.10 evidence-provenance path links those carriers to CoaxialityEvaluation-L123 and its CoaxialityResult-L123.
(References A-FIT-01 and L-FIT-01; avoids RFC deontics.)
E-FIT-02 (Observed).
For lot L123 and window Γ_time=[t1..t2], under conditions pinned to A-FIT-01 and using carriers in E-FIT-01, CoaxialityEvaluation-L123 produced CoaxialityResult-L123: measured coaxiality was within tolerance zone T (interpreted per L-FIT-01).
(References A-FIT-01, L-FIT-01, and E-FIT-01.)
The resulting account states: “For lot L123 during [t1..t2], the evaluation under A-FIT-01 found coaxiality within tolerance zone T, interpreted through L-FIT-01 and supported by the carriers in E-FIT-01 (E-FIT-02).”
If the datum scheme changes, the author reopens the interpretation and fitness of the measurement for that scheme. The earlier finding retains its stated datum and conditions.
Further question: explain the production and evidence duties. A reader arranging release and later reliance also needs to know who is bound to maintain the process envelope and retain its evidence. Recovering the separately obtaining commitments supplies these additional claims:
D-FIT-01 (Duty).
Admitted production-engineering system ProcessEngineer-A is the duty bearer of separately obtaining ProcessEnvelopeCommitment-FIT-01 : U.Commitment; it SHALL ensure A-FIT-01 holds for the production lot and SHALL not release the lot for use when A-FIT-01 is false.
(References A-FIT-01.)
D-FIT-02 (Duty-to-evidence linkage).
Admitted quality-engineering system QualityEngineer-A is the duty bearer of separately obtaining FitEvidenceRetentionCommitment-02 : U.Commitment; it SHALL retain or expose the carriers referenced in E-FIT-01 for the production lot.
(References E-FIT-01 by ID.)
A.6.B:8.4.4.3 - Readable recomposition
For this broader question the author connects the definition, admissibility, duties and observation. This selection lets the reader distinguish what the lot evaluation established from what each duty requires.
Tech bundle:
- Meaning of coaxiality:
L-FIT-01. - Boundary arity and participants:
L-FIT-02. - When the claim is admissible:
A-FIT-01. - Who has the process-envelope duty:
ProcessEngineer-AunderD-FIT-01. - What we observe and keep as carriers:
E-FIT-01and measured outcomeE-FIT-02(with retention dutyD-FIT-02).
Plain paragraph:
“In this expanded case, ‘ensures coaxiality’ is made precise by fixing the definition and datum scheme (L-FIT-01) and by making the boundary participants explicit (L-FIT-02). The mechanism admits this coaxiality evaluation only under the declared manufacturing and assembly envelope (A-FIT-01). ProcessEngineer-A has the process-envelope duty stated in D-FIT-01. QualityEngineer-A has the evidence-retention duty in D-FIT-02. Compliance is adjudicated using the measurement and process carriers listed in E-FIT-01; for lot L123 over Γ_time=[t1..t2], the observed coaxiality was within tolerance E-FIT-02.”