Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:55:15 UTC

A.6.3.RT:5.4.a - Boundary to bridge-bearing comparison

A local reliability note about Pump P-2 becomes a comparison claiming operational equivalence with Unit U-7 in another plant. That is not merely representation change. Keep any local representation delta in RT. Under F.9, first resolve the two F.17 SchemeSenseCell values and test that a Bridge obtains; then state the separate C.2.1 bounded-use claim for this equivalence or substitution use.