A.6.3.NAR:5.2 - Architecture trade-off narrative
An architecture team needs to explain a candidate selection. It can order the account by the binding constraint, compared alternatives, decision and remaining trade-off. Preserve the decision’s stated basis rather than inventing the sequence by which the team discovered it.
Source fixture. For project system S, data must be processed at Plant P. Under the same workload W, candidate C1 processes at P with a measured median latency of 40 ms; C2 processes at regional site R outside P with a measured median latency of 30 ms. Decision D selects C1 because the placement constraint is mandatory. D does not authorize implementation.
Narrative. Decision D selects C1 because it processes S's data at Plant P, as the mandatory placement constraint requires. C2 processes at regional site R outside P, which would violate the mandatory placement constraint. Under W, its measured median latency was 30 ms, 10 ms lower than C1's 40 ms. D does not authorize implementation.
Comparison. The narrative foregrounds the constraint before the performance trade-off. It preserves both candidates, sites, workload, measured characteristic and decision basis; the 10 ms difference follows from the two comparable medians. It asserts no discovery history or actual implementation. This short fixture omits no source claim. For a changed workload or placement rule, return to the measurement and decision basis before carrying the selection forward.
When the receiver needs exact claim identity, ArchitectureTradeoff-X and ArchitectureRationale-Y concern the same project system, and ArchitectureRationaleNarrativization : X -> Y states the construction and return. Independently identified A.22 candidate structures are designated by the source claims. The posture is prospective during choice and retrospective when recounting the decision; publication, decision, synthesis and performed Work remain separate.
A.6.3.NAR:5.2.1 - Architecture narrative repair after source change
Later, C2 has a new measurement and the placement rule changes. For an account of decision D, keep the rule and measurements on which D was made. For a choice today, read the new rule first. If it still excludes R for system S, a faster result at R gives no ground for selecting C2. If it permits R, C2 now meets that placement condition. Compare its new measurement with C1’s under a common workload and check the other selection criteria before reporting a preference. Both candidates can remain in the comparison throughout. To report a new selection, identify the decision actually made. For implementation, identify the decision or other current mandate that authorizes that work.
Use C.33 to identify which relation the new narrative captures and what its representation leaves out. An earlier measurement can remain relevant to the history of D even when it no longer supports a comparison under the current workload. Use C.34 where a correspondence matters across the two accounts. Update the affected claims and links to their sources. In an exact case, reidentify only source epistemes whose C.2.1 identity changed and restate the affected construction n under A.6.3.