| Treating executable text as sufficient Method identity. | Identify the reusable way under A.3.1. When method-description membership is claimed, identify the episteme and apply §4.1. Use §4.2 for representation and publication, and A.15.1 for a run that happened. |
| Treating a Work log as a method description solely because it records a sequence. | The log is an episteme about dated Work, not the Work or a method description by being recorded. Identify the occurrence under A.15.1; cite or write a separate method description only when its claims pass the membership rule. |
| Inferring safe use solely from protocol approval. | Separate method description, approval or gate claim, safety evidence, work plan, and work occurrence. |
| Leaving the optimization-model claim unresolved. | Ask whether the episteme says how a scheduling Method works or instead states variables, constraints, and an objective for a formal model. Keep the solver run as Work and any selector mechanism under A.6.1/E.20. |
| Inferring project-work dispatch from a query-plan layout. | A database plan or graph may represent ordering without commanding project Work. Use C.2.P.DR when layout is being read as dispatch; write a WorkPlan or ordered Method only when its own claim states that sequence. |
| Inferring the workflow sequence solely from a diagram route. | Check whether the method claim states the sequence. If the route is only a graph path, event trace, or drawing convention, keep it in the representation; do not turn it into a WorkPlan or performed Work. |
| Conflating a new file version with refinement of the Method. | Separate the C.2.1 edition relation, a comparison of description claims, and any refinement relation between Methods. A file version establishes none of them. |
| “SOPs are notes, code is the real spec.” | Neither notation establishes membership. Compare what each episteme claims about the Method. Ask adequacy only for a concrete proposed use. |