| Treating executable text as sufficient Method identity. | If the claim concerns the reusable way, name its participant meanings, applicability, effects, and bounds under A.3.1. When a method-description membership claim is needed, recover the claim-bearing episteme expressed by the executable text and apply A.3.2’s membership test. |
| Treating a workflow diagram as the dated Work occurrence. | For a claim about planned work, use A.15.2; for a claimed dated occurrence, use A.15.1 and its occurrence basis. Route the diagram by what it describes; apply A.3.2 when a method-description membership claim is needed. |
| Inferring prescribed action from graph layout. | Use the pattern that defines the represented structure, such as E.18 for a transformation flow, and C.29 for a mathematical representation claim. Apply C.2.P.DR when layout is being made to prescribe action. State any gate passage or authority claim separately under its own rule. |
| Leaving the optimization-model claim unresolved. | Ask whether the sentence states a formal object, a method description, a reusable way, a work plan, dated Work, or evidence; then keep only that claim in the method position. |
| Inferring safe execution solely from protocol approval. | Separate publication-state claim, gate or authorization claim, evidence claim or assurance claim, work plan, and dated work. |
| Using a team’s identity in place of method semantics. | Keep admitted Systems, local system-role kinds, classifications, assignments, and capability claims with their direct patterns; keep participant meanings, applicability, conditions, effects, and bounds with the Method. |