A.3.1.WT:5 - Archetypal Grounding - SSFD Workplace Projects
The automotive SSFD programme supplies reports and review evidence about actual workplace projects without supplying a universal effectiveness claim. More than 300 engineers participated in a three-year transfer programme; training was followed by supported four-to-six-month workplace projects. Seventy-two of the first 100 reviewed project reports recorded SSFD use, and 41 contained enough detail for deeper analysis. Across those 41, the study reports 95 examples of evidenced individual benefits while distinguishing direct and indirect contribution.
The published paper supplies report evidence. Apply §4.1(7) to establish an occurrence at the scale claimed. The project report, direct observation or other evidence can provide those grounds. Give the findings each source supports and identify any grounds still missing for admission or for crediting particular contributors. The slices below distinguish possible answers to the later questions without admitting Work by citation.
A.3.1.WT:5.1 - Preserve the Status Branch
Before using the replay, establish whether SSFD is an admitted Method for the current FPF use. If it is, each supported project occurrence may be tested for its own obtaining enactsMethod relation. If it is not, admit the workplace Work independently, retain the SSFD account as a candidate, and name the independently admitted Methods whose enactment relations obtain. The report statement “used SSFD” does not perform either admission automatically.
A.3.1.WT:5.2 - Representative and Discriminating Slices
| Slice | Reported project facts used | Evidence returned | Stop retained |
|---|---|---|---|
| Project 11 | The report concerns functional analysis of a new by-wire steering system and records 48 failure modes for four system functions, 44 new requirements and design rules, 44 test cases for individual systems, and 33 requirements and test cases for the overall system. | One bounded application account for checking whether description, representation, and support claims were usable in that project situation, plus the reported results and burdens available from the source. | Do not infer that every programme participant had the same capability or that the reported benefits came from SSFD alone. |
| Project 32 | The report exposes difficulty representing the relation between a closed-loop sensor and controller. | A discriminating representation difficulty for A.3.1.CC and an unlike-situation comparison for A.3.1.FT. A.3.1.CC uses the direct representation governor for the affected action and C.37 when a selection question remains; when a Method-specific cross-use profile is needed, it checks the affected action and cross-use dependency under C.37.MP:4.2. The report establishes neither selection result by itself. | Do not turn the difficulty into general Method failure or claim that Project 11 supplies the counterfactual. |
| 41-report evidence set | The investigators identified 95 instances of benefits in 41 project reports and examined how SSFD figured in those accounts, including uses of its outputs in subsequent work. | The documented outputs and the investigators’ interpretation of the pathways can inform later comparison of domain results, burdens and evidence strength in C.11.MV. | An estimate of what would have happened without SSFD requires additional grounds. A claim about a participant’s current capability requires evidence about that participant’s work. |
The useful A.3.1.WT result is therefore not “SSFD works”. It is a set of reported workplace-project accounts, situation and support conditions, observed representation difficulties, reported results and burdens, evidence-source qualifications, and explicit gaps for three separate later judgments.
A.3.1.WT:5.3 - EC-417 Early Stop
The full EC-417 application supplies the receiving problem, alternatives, calculations and the distinct limits used below.
In EC-417, the three-release statement remains a WorkPlan. The three named-user retrieval, tailoring, and selection-support occurrences from A.15.8.MS establish only those support tasks; they do not perform a release or enact the candidate whole C-EC-Release-v2.
For a release trial, apply §4.1(6–9) to the release’s own occurrence, support, evidence and authority facts. The observed support tasks do not supply that release Work; until its basis is recovered, return missing-performed-work. Even after a release is admitted, keep C-EC-Release-v2 as a candidate and send the occurrence evidence to the selected A.3.1.CC, A.3.1.FT or C.11.MV question.