A.3.1.CC:4.2 - Record the Result
| Result position | Required content |
|---|---|
| coherence use | Blocked decision, reader, relied-on claim, qualification window, agreement and stop conditions. |
| subject status | Admitted Method or candidate account, plus separately identified Work, WorkPlan, description, representation, support, and evidence results in scope. |
| maintained claim | Claim or predicate, owner, edition or occurrence, source or construction basis, intended use, and currentness. |
| comparison basis | Construction requirement, description claim, selected representation rule, support premise, trial evidence, or declared conformance criterion used. |
| finding | Agreement, contradiction, missing information, failed declared conformance, stale source or edition, or missing owner; include the evidence reach. |
| repair routing | One maintained result to reconsider, smallest correction, unaffected claims and statuses, and downstream uses that must be rechecked. |
| rerun | Same-check result after repair, or the changed use or basis that requires a new check. |
| return | Verified bounded claim, corrected claim, or named gap; material use limits and reopen condition. |
Use the existing claim and finding records or a concise account that preserves these distinctions; the positions do not require a separate form.