Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

A.2.6:10.3 - Method–Work guard families (capabilities)

WG‑1 - WorkScopeCoverage (mandatory). Reliance on a holder-ability claim for a Work step requires coverage by the WorkScope that claim designates:

WorkScope(holderAbilityClaim) covers JobSlice

WG‑2 - work-measure target set satisfied (mandatory for deliverables). Compare the holder’s supported performance with the result required on the JobSlice. For a specified number, rate or tolerance, compare compatible measures including the uncertainty that could change the decision. For a named result or grade, apply its success predicate.

holder performance on JobSlice satisfies the receiving criterion

WG‑3 - qualification for current reliance (mandatory for operational use). Establish whether the grounds for the claim apply at the receiving decision time and to this holder, configuration and work. A governing time window has its own predicate:

qualificationWindowHolds(holderAbilityClaim, qualificationWindowPolicy, evaluationTime) = true

Where the rule relies on an unchanged configuration or a still-applicable verification, establish that condition. A date limit is needed when the rule makes age or expiry relevant.

WG-4 - Translation branch for capability use.

Translate U.WorkScope only when its condition predicates use exact local senses that differ from those needed by the job slice. Require the obtaining F.9 Bridge and a separate affirmative C.2.1 claim naming this Work-scope translation’s direction, rule, and tolerance; establish the exact A.10 or B.3 reliance branch before the capability guard uses the result. Neither the holder-ability claim nor the job slice supplies a hidden .Context field that automatically selects this branch.

Observed mapping loss is evidence about the use claim, and permitted loss is its tolerance. If the claim’s rule and tolerance permit translation only for part of the source Work scope, identify that part and return its target image.

WG‑5 - Δ(WorkScope). A wider Work scope admits new conditions for assessing the holder. To rely on deliverability there, establish that the available grounds cover the added conditions. An invariant or an applicable earlier qualification can cover a range at once. Obtain new evidence where the grounds run out. A membership-preserving refit retains the covered slices.