Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

A.2.2:11 - Consequences

Benefits.

  • Planning separates “can do” from “is assigned now”.
  • Method steps can name capability thresholds without putting extra meaning into system-role-kind names.
  • Work records can be judged against the capability claim and fit predicate current at the time of work.
  • The holder, operating conditions and grounds for each contribution to the promise are explicit.
  • Composite-system ability can be stated at the right holder instead of scattered across parts.

Costs.

  • A relied-on ability claim must make its operating conditions, supported performance and qualification basis recoverable, including attained bounds for a quantitative criterion.
  • Teams need to stop using system-role labels or assignments as shortcuts for ability.
  • Some old “function”, “service”, “process”, and “algorithm” sentences need kind recovery before they can be used in FPF.

These distinctions let practitioners check authorization, ability, method, and performance separately.