A.15:5.1.c - Scenario guides method selection, not performed work
Source set. A fabrication cell has an accepted qualification for a cold-forming method family, MF-2. It permits this material below a stated thickness on the installed tooling and requires a continuous 30-minute setup and forming window. The proposed batch has material below that thickness, the qualified tooling in place and a 40-minute window. The planner can use the qualification and these batch conditions to test the family’s applicability.
Published slice. For this batch the material and tooling meet the qualification and both operations fit the available window, so MF-2 is admissible for planning. If the available window were 20 minutes, this qualification would give no basis for scheduling MF-2 there. Another qualified family might still fit. When the commission calls for a plan, select an applicable Method and arrange the Work. A claim about what actually ran requires evidence of that occurrence.
The scenario can guide Method-family selection and planning. Identify a selected Method or resulting WorkPlan in the account where that result is needed. Ground any later dated Work independently under A.15.1; a record may designate it but is not that occurrence. For evidence, gate or engineering-justification reliance, establish the required claim, relation or decision under its direct rule, such as A.20 for internal-constraint results, A.21 for gate decisions or B.3 for assurance. Use A.10 when that reliance needs a replayable source-to-use account. If a required basis is unavailable, narrow the use and keep the needed gap or continuation in the receiving account.