A.15.8:1 - Problem frame
Use this when. A recipient needs a service to continue or recover after interruption, handoff, delay, support loss or replacement. To design its arrangements, begin with the service due, the allowed disruptions and the time for recovery. Work back to the contributions, access and state needed under those conditions (§4.2). This can yield a reusable design before a particular shift has a plan. To assess an arrangement for a particular performance, choose the relevant branch:
- Actual-Work branch: start from one dated
U.Workoccurrence already admitted underA.15.1. Name actual performers, assignments, and attribution only where the rules governing those claims pass. - Present-WorkPlan branch: start from one present
U.WorkPlanunderA.15.2. Intended performers and intended performance remain declaration-local plan content; they are not an existing futureU.Work, obtaining assignment, or actual attribution.
For an assessment of a particular performance or plan, the following two forms show how to state the conclusion.
Actual Work: For this admitted Work occurrence, these Systems performed it under the attribution rules; these other Systems or values supported it; this is where the state needed to continue lives; this is what the available evidence establishes about continuation or recovery; continue within the supported conditions, repair the affected relation, or stop as that result warrants.
Present WorkPlan: For this present WorkPlan, these Systems are named as intended performers in its declaration-local content; these other Systems or values support the proposed configuration; this is where the state needed for intended performance would be recovered; this is what the plan and applicable evidence establish about the promised service under the specified changes; obtain a needed basis, revise the plan, continue within the supported conditions, or stop as that result warrants.
What to return. For a design, describe an arrangement that can maintain or restore the promised service, the conditions it covers and what it needs. If the design relies on a handoff, explain how the next performer can take up the work in time. For a particular Work or WorkPlan, identify the performers or intended performers, supports and continuation state relevant to the decision. Return the supported conclusion and the conditions that remain open.
What changes in practice. A team can choose the support and state its service needs, identify a loss that defeats the promise or justify continued service under the allowed changes. It can then retain or repair the configuration, investigate an unresolved condition or stop the affected use.
Cheap non-use. Do not use this pattern merely because Work uses a tool, a person takes notes, software has state, a bacterium responds to its environment, or several Systems participate.
Stop when the available grounds establish the configuration and recovery conditions needed for the decision. A reusable design can settle a design commission. To settle an assessment of a particular performance or plan, the grounds must apply to that Work or WorkPlan.
If A.15.5 has established an ordinary full kit and no interruption, handoff, support loss, or configuration ambiguity can change entry, stop there. If the configuration is adequate and only the next action during current Work is open, use A.15.7. For ordinary preparation and return after an interruption, use A.15.10 when the purpose, method or unfinished contribution must be recovered; that use does not require a configuration test.
Not this pattern when. Use A.1 to recognize a proposed System, and B.2 when changed facts require comparison with an established prior whole; A.2.2 for capability of one admitted holder; A.15.1 for Work occurrence identity or resumption segmentation; A.15.2 for the WorkPlan; A.15.5 for ordinary entry readiness; A.15.7 for next-action selection; A.22 for one selected Structure; C.30 for architecture; the pattern governing a representation; A.2.4 for the first evidence-use or status-use classification and A.10 when the bounded source-to-use account must remain replayable; or the applicable domain Method when only its test, threshold, algorithm, safety rule, or intervention is missing.