A.15.7:7 - Conformance Checklist
- CC-A15.7-1 — Current Work. Is ongoing Work identified, or did the user stop and name
A.15.2,A.15.5, orC.11for the question that remains? - CC-A15.7-2 — Method limits. Is the applicable domain Method and the relevant allowance or stop explicit?
- CC-A15.7-3 — Action-guiding information. Does every stated fact matter to the action, and is the observation, report, recommendation, or other information current enough when that matters?
- CC-A15.7-4 — Method relation. Are domain and steering Methods distinct, with co-enactment or composition asserted only from its own basis?
- CC-A15.7-5 — Available actions. Are mandatory action, recognition, comparison, generation, and tool-planning branches kept separate?
- CC-A15.7-6 — Chooser and performer. Does the account identify the deciding System and distinguish a named performer, a jointly allocated action or an authorized later choice according to what was decided? Do any claimed authority and capability have their own grounds?
- CC-A15.7-7 — First result. Does the answer state the supported continuation or blocker and its grounds, with any stop or feedback condition needed for its use?
- CC-A15.7-8 — History and corrected claims. Are later observations, plan changes, performed actions and Method changes kept at their actual times, with any refuted earlier claim corrected and its dependents rechecked?
- CC-A15.7-9 — Plain use. Can a cold practitioner understand what to do before meeting the formal distinctions?