Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

A.15.7:7 - Conformance Checklist

  • CC-A15.7-1 — Current Work. Is ongoing Work identified, or did the user stop and name A.15.2, A.15.5, or C.11 for the question that remains?
  • CC-A15.7-2 — Method limits. Is the applicable domain Method and the relevant allowance or stop explicit?
  • CC-A15.7-3 — Action-guiding information. Does every stated fact matter to the action, and is the observation, report, recommendation, or other information current enough when that matters?
  • CC-A15.7-4 — Method relation. Are domain and steering Methods distinct, with co-enactment or composition asserted only from its own basis?
  • CC-A15.7-5 — Available actions. Are mandatory action, recognition, comparison, generation, and tool-planning branches kept separate?
  • CC-A15.7-6 — Chooser and performer. Does the account identify the deciding System and distinguish a named performer, a jointly allocated action or an authorized later choice according to what was decided? Do any claimed authority and capability have their own grounds?
  • CC-A15.7-7 — First result. Does the answer state the supported continuation or blocker and its grounds, with any stop or feedback condition needed for its use?
  • CC-A15.7-8 — History and corrected claims. Are later observations, plan changes, performed actions and Method changes kept at their actual times, with any refuted earlier claim corrected and its dependents rechecked?
  • CC-A15.7-9 — Plain use. Can a cold practitioner understand what to do before meeting the formal distinctions?