A.15.6:7 - Conformance Checklist
- Start with section 4.0: read the claim and name the subject it concerns rather than interpreting the management label as a kind.
- For an actual project, apply A.15.1 to the composite
U.Work, then the five project qualifications in section 4.1. Planning material remains content of itsU.WorkPlanuntil Work occurs. - Use obtaining Work-part relations and A.15.1 identity rules; apply a continuity policy only for the boundary question the receiving use needs. A time interval, team, charter, repository, policy or label establishes neither parthood nor continuity.
- For a process concern, choose among
U.Method, an A.22-selectedU.Structure, andTransformationFlowStructureas section 4.2 states. Ground each evidence use in the claim it supports: Method enactment needs the A.15.1 relation; an operation-application result needs its A.6.1 declaration, application and bindings; a timing, cost or condition claim needs its own relevant evidence. A report of admitted Work keeps its full admission basis recoverable under A.15.1:4.4 without repeating all of it in each narrow claim. - Preserve multi-object evidence until the current use selects a grouping, query, or constraint. State omitted information when it limits that use or could mislead its reader. Identify the selection result from its claims under C.2.1; it can be a case subject when its independent identity and the closure question warrant that use. Method and Work claims retain their own admission grounds.
- For a case concern, name the subject or claim, the references used by closure and the closure basis. Name a downstream use when it matters to the current question and keep it outside that closure. Keep any case-record episteme under its own identity.
- Recover each description’s claim content, EntityOfConcern, and effective scheme under C.2.1. Treat notation readability or simulation support as a representation-use question, not as subject identity, claim truth, case closure, or performed Work.
- Recover the product, named extended enterprise and agreement basis for a SoI designation under section 4.1a, keeping the local system-in-hand and finite acceptance of organizational work distinct. System identity, designation, local system-role classification and any assignment occurrence remain separate in every direction. Do not backdate a future System.
- Use section 4.1a for a project-selection account. A direct designation may answer the ordinary case; a stronger compound claim needs recoverable constructor semantics, and
missing-substrateblocks only that stronger claim. - Keep performer, Work, change, result, success, acceptance, evidence, decision, description, publication, and later use as separate claims. Apply the pattern that defines or tests the current relation.
- For result wording, name the referent and say what it is a result of or for; then use the applicable A.6.P.WMR outcome. Whole-project aggregation also needs its Work-part basis and relation-and-measure policy.
- Use E.18.NET only for independently identified transformation-flow structures connected by obtaining cross-boundary relation occurrences. Work membership in a project requires obtaining A.15.1 work-parthood.
- For a Transformation, first identify the actual bounded change and continuing referent. Add an actor-side or Work-realization claim only when its own predicate and facts establish it.
- Reuse of one Method or transformation-flow structure elsewhere has its own enactment or selection facts and creates neither cross-project Work parthood nor cross-case identity.