Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:20:05 UTC

A.15.6:7 - Conformance Checklist

  1. Start with section 4.0: read the claim and name the subject it concerns rather than interpreting the management label as a kind.
  2. For an actual project, apply A.15.1 to the composite U.Work, then the five project qualifications in section 4.1. Planning material remains content of its U.WorkPlan until Work occurs.
  3. Use obtaining Work-part relations and A.15.1 identity rules; apply a continuity policy only for the boundary question the receiving use needs. A time interval, team, charter, repository, policy or label establishes neither parthood nor continuity.
  4. For a process concern, choose among U.Method, an A.22-selected U.Structure, and TransformationFlowStructure as section 4.2 states. Ground each evidence use in the claim it supports: Method enactment needs the A.15.1 relation; an operation-application result needs its A.6.1 declaration, application and bindings; a timing, cost or condition claim needs its own relevant evidence. A report of admitted Work keeps its full admission basis recoverable under A.15.1:4.4 without repeating all of it in each narrow claim.
  5. Preserve multi-object evidence until the current use selects a grouping, query, or constraint. State omitted information when it limits that use or could mislead its reader. Identify the selection result from its claims under C.2.1; it can be a case subject when its independent identity and the closure question warrant that use. Method and Work claims retain their own admission grounds.
  6. For a case concern, name the subject or claim, the references used by closure and the closure basis. Name a downstream use when it matters to the current question and keep it outside that closure. Keep any case-record episteme under its own identity.
  7. Recover each description’s claim content, EntityOfConcern, and effective scheme under C.2.1. Treat notation readability or simulation support as a representation-use question, not as subject identity, claim truth, case closure, or performed Work.
  8. Recover the product, named extended enterprise and agreement basis for a SoI designation under section 4.1a, keeping the local system-in-hand and finite acceptance of organizational work distinct. System identity, designation, local system-role classification and any assignment occurrence remain separate in every direction. Do not backdate a future System.
  9. Use section 4.1a for a project-selection account. A direct designation may answer the ordinary case; a stronger compound claim needs recoverable constructor semantics, and missing-substrate blocks only that stronger claim.
  10. Keep performer, Work, change, result, success, acceptance, evidence, decision, description, publication, and later use as separate claims. Apply the pattern that defines or tests the current relation.
  11. For result wording, name the referent and say what it is a result of or for; then use the applicable A.6.P.WMR outcome. Whole-project aggregation also needs its Work-part basis and relation-and-measure policy.
  12. Use E.18.NET only for independently identified transformation-flow structures connected by obtaining cross-boundary relation occurrences. Work membership in a project requires obtaining A.15.1 work-parthood.
  13. For a Transformation, first identify the actual bounded change and continuing referent. Add an actor-side or Work-realization claim only when its own predicate and facts establish it.
  14. Reuse of one Method or transformation-flow structure elsewhere has its own enactment or selection facts and creates neither cross-project Work parthood nor cross-case identity.