A.15.6:4.1 - Recover an actual project as composite U.Work
In Plain use, actual project denotes one temporary composite U.Work occurrence: the performed work whole, with a start and a completion or termination condition. The performing organization or cooperating performer Systems remain distinct from the Work. Any claimed collective System needs its own A.1 recognition basis.
The intended work and result are described in a U.WorkPlan or other intention episteme; the system being created or changed has its own identity. A continuing organization can perform successive or overlapping projects and ongoing operational work. A project-focus decision, authorization, schedule, budget, dashboard or repository is a neighboring object or claim; none supplies another identity for the performed whole.
Admit the candidate composite under the full A.15.1:4.1 test, including the A.1:4.2 common construction of that same occurrence. While it is a candidate U.Entity, ground its construction and performance facts independently. Recover every actual performer’s A.13 core: the admitted System, local agential system-role kind and classification, obtaining assignment for the scope, working situation and window, evidence adequate for the local criterion and classification, and any characteristic profile consumed by a Grade, autonomy, criterion-dependent or assurance claim.
A.15.1:4.1 also governs the Method actually followed, temporal extent and complete-occurrence containment under a declared local rule; the containment facts precede the typed Work-containment assertion. Reuse an already established full admission result when it covers this occurrence.
Admit each included Work occurrence independently. After the composite is admitted as W : U.Work, assert its grounded typed enactment, containment and Work-part relations. An admitted part or a temporal inclusion alone does not admit the whole or establish Work parthood. If a common or Work-specific premise is unknown, leave the dependent admission unresolved; if a necessary condition fails, reject that proposed basis while retaining independently supported facts.
When precise assignment-bound attribution is current, apply F.6 after admission to each claimed assignment-bound contribution, relating the Work to the same obtaining A.13 assignment for that performer, preserving direct case support, holder equality, species, participants and coverage. A short attribution account may omit an unused identifier only when every required link remains recoverable. F.6 is not an admission premise. Apply these five project-specific qualification tests to the independently admitted Work:
- The composite work has a temporary or transient boundary with a start and a completion or termination condition.
- An accepted intention episteme states the intended objective and any intended product, service, result, or value. For this qualification, either an existing direct predicate connects its intended-performance designation to the admitted Work and obtains, or one local claim under A.15.2 or A.6.RCD names the plan or decision, designation, Work, applicable policy, and independently obtaining Work facts. An absent predicate, applicability condition or required occurrence rule returns
missing-governor; unavailable constructor semantics for a proposed local derivation returnmissing-substrateunder A.6.RCD. When the governor exists, preserve its inapplicable result or use test 5’s reason-specific result for the applicable test and available facts. Do not imply a generic plan-or-decision relation. - Apply A.15.1’s Work-part and identity rules. When interruption, resumption, split or merge leaves an identity question that the receiving use must resolve, use the applicable continuity policy to interpret the actual history.
- At least one independently admitted performed Work occurrence is connected to the composite Work by an obtaining work-part relation.
- For each claim used to qualify the project, name what the claim is about—the participating system, affected referent, transformation, result referent, or another subject actually asserted—and say how that subject matters to the Work. Choose a claim form whose rules fit that use: an obtaining direct relation; a typed
A.6.1binding for a reusable-operation application; a local production, inception or completion claim underA.15.PROD; or another local claim underA.6.RCD. If the claim cannot be asserted, preserve independently established facts and return the reason-specific outcome fromA.6.P.WMR. Distinguish a failed applicable test for the attempted polarity, missing deciding facts, an absent governing rule, known inapplicability and missing constructor semantics. If the facts contradict a necessary condition of the specified qualification, they rule it out within that scope. A search that merely failed to find the needed evidence can leave both answers possible. A missing rule calls for the lightest sufficient contribution under A.6.RCD, not automatically a new relation kind or pattern.
No performed work means no actual project occurrence yet. A proposal, charter, authorization, schedule, budget decision, or funded intention can establish a U.WorkPlan and related commitments. It does not backdate performed work, a future system, an assignment, an actual change, or a result.
The project occurrence uses the identity, temporal extent, parts, episodes, continuity, and relation-specific aggregation defined in A.15.1. Project wording adds no second identity rule. When a reader asks for the project result, ask first: What is the result, and result of or for what? Keep that referent in the kind or claim already established for it, then apply test 5 to the proposed relation or claim.
State what failed. Confirmed absence of any performed work by the date in question rules out an actual project occurrence by that date. An incomplete search for such work leaves the answer open. To exclude every admissible way of obtaining the result, establish that a condition necessary for all of them failed, or cover all admissible ways and show why each was ruled out. Different ways may fail for different reasons. Preserve independently established facts about the subject and the target specified in the plan.
Whole-project roll-up requires obtaining work-parthood plus an aggregation policy defined for the one relation and measure being aggregated. Outputs, effects, verdicts, epistemes, deliveries, and uses do not become one result merely because they share the project label.