Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

A.15.6:10 - Rationale

Admit actual project Work through the full A.15.1:4.1 test for the same candidate occurrence, with every actual performer’s A.13 core and any conditionally required profile. Independently grounded common construction and Work-specific facts support membership; typed enactment, containment and Work-part assertions follow under their own predicates. Use F.6 afterward for any precise assignment-bound attribution. Add an episode, continuity or aggregation claim only when the project use needs it. A short project account may omit assignment identifiers or further valid boundaries its receiving claim does not use.

State resource use, Work-to-referent facts, change, production, evaluation, delivery, acceptance and later result use as separate claims, each under its predicate and case basis. The five project-specific tests qualify that admitted Work. This preserves the performed whole’s identity while keeping its plans, performing organizations, Transformations and descriptions distinguishable.

Repeatability belongs to U.Method; direct method-side relations remain unbundled until the structure’s constituents are identified independently, its selected relations obtain, its constraints are applied, and one use frame names the selection question, admissible action and stop or return condition. Only then select one U.Structure under A.22 and, if useful for that question, call it MethodRelationStructure. Transformation-flow organization belongs to TransformationFlowStructure. None is the unique dated Work occurrence.

A case remains centered on the subject or claim named by its closure question, even when several Methods, structures, Work occurrences, Systems, results, measures, and decisions are relevant. Recovery therefore preserves more information than a three-label hierarchy.

The common product SoI and local-subject distinctions follow the same economy. A plan or decision can designate a system; a shared systemic account additionally explains why that system’s intended use organizes the participants’ joint undertaking. A.1.STM develops that basis and the connection of local contributions to it, while A.2 separately answers whether an actual System is classified under a defined local system-role kind and U.SystemRoleAssignment answers which assignment occurrence obtains. Use that designation when it answers the question.

For a one-case compound claim, recover the constructor semantics and direct facts; materialize or pin a substrate only for nontrivial derivation, interoperability, proof, or reuse. Return missing-substrate only for a needed stronger claim whose operator semantics are unavailable.

An intended future System remains claim content until inception. Reopen A.6.RCD for a reusable predicate or relation kind only when a named receiver needs that stronger result.