A.15.5:2 - Problem

Without one local work-entry readiness claim and result semantics:

  1. Full-kit preparation becomes an umbrella for planning, source relations, gate passage, and performed work.
  2. A green tile or ready label is treated as a GateDecisionResult.
  3. Declaration-local planned-filling content inside the WorkPlan is overread as evidence that the planned values were prepared or used.
  4. Resource readiness is confused with resource consumption.
  5. A committed item becomes “done” by position in a board, not by a separately established completion claim about dated U.Work.