| ISO/IEC/IEEE 12207:2017 describes software life-cycle processes, activities and tasks; it is retained as a historical anchor, withdrawn on 29 April 2026 and superseded by 12207:2026. ISO/IEC/IEEE 15288:2023 provides system life-cycle process descriptions without prescribing a specific life-cycle model and refers detailed information-item content to ISO/IEC/IEEE 15289. | Keep the declaration, intended plan content, and performed work separate. | Treating a process-tooling layout or checklist field as an FPF declaration. |
| SLSA v1.2 build provenance separates build definition, including resolved dependencies, from run details; in-toto Statement v1 separates subjects from the typed predicate content. | Cite declaration and edition only when replay depends on them; keep run, provenance, result, and evidence claims separate. | Importing a supply-chain record schema as a universal slot or result ontology. |
The Nix 2.26 manual’s lock-file mechanism records resolved dependency inputs in flake.lock, including revisions where applicable and content hashes. An existing, up-to-date lock file preserves the selected direct and transitive dependencies for repeatable input resolution. | Pin the selected declaration or value episteme when another resolution could change the planned meaning. | Saying latest when a later comparison needs one edition. |