A.15.2:7e - Relations
- Builds on: C.2.1 for episteme identity and local assertion identity;
A.15for System-Role-Method-Work alignment;A.15.1for independently identified performed Work occurrences admitted underU.Work; A.2.1 for directU.SystemRoleAssignmentspecies; A.2.2 for qualified holder-ability claims, thresholds and fit conditions; A.3.1 forU.Method; and A.3.2 forU.MethodDescription. - Coordinates with: B.5.MR for refinement and abstraction comparisons between plan models; A.15.3 for planned filling against governed declarations; A.6.1 for operation argument and result declarations; A.6.5 for RelationSignature participant declarations; A.6.RCD for the existing-direct/local-compound/reusable-predicate/relation-kind economy; E.24/E.24.UK for any later kind admission; A.6.REL only after an admitted direct or derived relation needs occurrence discipline; A.15.4 for work-relevant appearance-based reliance repair; A.15.5 for work-entry readiness; C.27.TA for direct temporal-aspect claims; B.1.4 for temporal aggregation; B.1.6 for performed-resource aggregation; A.10 for accounts of independently established evidence-provenance relations; B.3 for assurance; A.20 for internal constraint results and A.21 for gate decisions; C.32.P2S for architecturing-flow references to intended work; E.17 for publication-use questions; and F.9 only for cross-context
SchemeSenseCellcorrespondence, with any proposed use and reliance routed through checklist item 7. - Used by: P2W carry-through when accepted problem-side content must guide work planning, and P2S carry-through when architecture-selected structures require intended-work epistemes. Both uses keep present plan subject, possible future performance, readiness, performed Work, actual use, evidence, gate, comparison, result, and downstream effect separately governed.