A.15.2:4.2 - PlanItem content
A PlanItem is a declaration-local content component in one U.WorkPlan. Its designator is interpreted inside that plan episteme. A receiving episteme may refer to this content component.
Use the recipient’s required result to choose the work each item must coordinate. Where several items contribute, trace what a later item needs from an earlier one and what common resource or decision constrains them together. One item can suffice for a bounded reservation. Choose only the claims the team will use. The list is an open recognition palette, not a record schema or a kind defined by enumeration. When one row mentions a neighboring relation, state its own participants and predicate rather than treating the row or reference as proof that it obtains:
- Target Method and description use — identify the Method intended for enactment. When a plan claim relies on a MethodDescription, cite that episteme and the instruction, constraint or justification it supplies. A.3.2 requires the admitted Method as its exact EntityOfConcern and substantive way-of-doing claims. Call it a later edition only when the C.2.1
EpistemeEditionRelationobtains. The plan describes intended Work that is to enact the Method, with a System as its intended performer; the MethodDescription supplies the claims used in planning. These intended relations do not establish an actual Work occurrence. - Planned window or entry condition — earliest start, latest finish, timebox, recurrence, blackout period, or another exact intended temporal condition.
- Intended performer and system-role-kind conditions — an intended performer
U.Systemdesignator, the local system-role kind under which that performer is expected to qualify, its admission conditions, and, only when it already obtains, an assignment occurrence whose species is declared underU.SystemRoleAssignmentand that is expected to cover later Work. A proposed holder-and-kind pair is not an actual assignment. - Capability requirement — an exact A.2.2 threshold or
CapabilityFitConditionneeded for planned work entry. Cite an existing capability claim only when the plan relies on it. The plan establishes neither the holder’s actual ability nor fit for the later work interval. - Resource budgets and reservations — intended energy, materials, machine windows, money, and reservation claims. A planned budget is neither a performed resource-use fact nor a B.1.6 aggregate ledger result.
- Dependencies and commitments — state the source item or commitment, the affected target item, and the condition that blocks, orders, overlaps, or excludes the planned work. A cited gate, approval, source-currentness, or promise claim keeps its own predicate; the citation establishes neither gate passage, approval, promise fulfilment, nor world-side ordering.
- Acceptance targets — name the criterion and target value or window that a later evaluation will test. The target is not the evaluation or acceptance verdict.
- Location, affected-subject, and asset constraints — where a proposed performance is intended to occur and which existing referent it is intended to concern, without asserting actual participation or change.
- Desired planned bindings — use A.15.3 only when the plan fills one participant, argument, or result member already declared by A.6.5, A.6.1, or another pattern that states both the member meaning and its later actual-use predicate. A.15.2/A.15.3 state the intended choice; the declaration states what later counts as actual use. Without that member, keep an ordinary plan choice when typed reuse is unnecessary, or return
missing-governorwhen it is necessary. - Expected effect, result, or delivery target — write the planned sentence with its intended subject and target: for example, the machine state sought, measurement window to be met, entity to be produced, or publication or delivery to be completed. Use the pattern that defines that effect. The broad words
output,result,outcome,deliverable, orhandoffdo not name one plan field or universal kind.
A method description may describe generic participant meanings and intended effects, but it supplies no planned filling by itself. Record the desired choice or expected effect in the plan.
Keep the baseline identifiable. Record later fulfilment or variance claims separately from the plan being compared. A new plan may use actual observations as its basis, but changing its identity-bearing content identifies another episteme under C.2.1. Keep step logic and solver details in the applicable Method or representation.