A.15.2:10 - Lowering, repair, and refresh conditions

Lower a candidate U.WorkPlan claim when the reader cannot identify one present EntityOfConcern, the effective ReferenceScheme, the horizon, one substantive PlanItem, or its intended-performance designator well enough to coordinate the intended work. Keep other participants in the ClaimGraph. Split only when combining independent subjects makes the selected EntityOfConcern untruthful or breaks the intended identity or comparison use under C.2.1. Retain independently usable content and any other established claims; do not claim a conforming WorkPlan without its membership basis.

When intended-work content changes, revise the affected claims and reconsider dependent coordination or comparison uses. A change to ClaimGraph, present EntityOfConcern or effective reference scheme identifies another C.2.1 episteme. Test EpistemeEditionRelation separately: established continuity supports an edition claim, an established negative result excludes it, and absent evidence leaves it unresolved. A replacement use can be selected without settling historical continuity. A file, layout, ticket key or revision label alone establishes neither reidentification nor continuity.

Do not rewrite an independently identified Work occurrence when only the plan changes, and do not make a revised plan evidence that Work occurred. Repair an actual participant, resource use, change, result, production, delivery, acceptance, evidence, or downstream effect under the pattern that defines that claim. When a one-case local fulfilment or variance assertion is no longer enough, use A.6.RCD disposition 3 if a stable predicate definition is sufficient. Only when a named receiver needs distinguishable relation occurrences does kind admission open; if no truthful occurrence settlement or governing pattern is available, preserve the plan, local assertions, and reusable definition and return missing-governor for that stronger use.

Before a new reliance-bearing use, confirm that the selected plan and supporting claims remain applicable and sufficiently current. Reuse unchanged grounds and recheck affected dependencies. Where the use crosses local senses, apply checklist item 7 to the actual correspondence, proposed transfer and reliance question; establish any required value conversion or verdict use under its own predicate. Keep only intended-work claims in the plan being used; route a separate readiness, performance, evidence, gate or result claim to its governing pattern.