A.15.1:2 - Problem (what breaks without a notion of Work)
- Plan and occurrence confusion. Schedules and diagrams get mistaken for performed work, so audits and KPIs attach to plans or representations instead of dated occurrences.
- Method-description and work conflation. A method description, code artifact, or SOP is reported as if it were performed work; conversely, logs are treated as recipes.
- Who and when leakage. People and calendars are baked into method descriptions; reuse and staffing agility collapse.
- Resource misattribution. Performed energy, material, time or cost use is booked to a Method or assignment as though it occurred there. State the actual resource-use relation involving the dated Work; keep estimates and derived Method-level statistics separate under their accounting rules.
- Mereology muddle. Teams hand-wave over work parts, retries, overlaps, or long-running episodes; roll-ups double-count or miss work.