Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:55:15 UTC

A.15.1:2 - Problem (what breaks without a notion of Work)

  1. Plan and occurrence confusion. Schedules and diagrams get mistaken for performed work, so audits and KPIs attach to plans or representations instead of dated occurrences.
  2. Method-description and work conflation. A method description, code artifact, or SOP is reported as if it were performed work; conversely, logs are treated as recipes.
  3. Who and when leakage. People and calendars are baked into method descriptions; reuse and staffing agility collapse.
  4. Resource misattribution. Performed energy, material, time or cost use is booked to a Method or assignment as though it occurred there. State the actual resource-use relation involving the dated Work; keep estimates and derived Method-level statistics separate under their accounting rules.
  5. Mereology muddle. Teams hand-wave over work parts, retries, overlaps, or long-running episodes; roll-ups double-count or miss work.