A.15.1:15a - P2W Performed-Work Use Relation
When E.18.1 reaches performed Work, first identify the scale of the performance claim. For each System credited at that scale, recover the A.13 local kind and criterion, classification, obtaining assignment, scope, working situation and window, with sufficient evidence for those core claims. Add a characteristic profile when the receiving use requires it. Then apply the full §4.1 test to the exact candidate action: establish its A.1:4.2 construction, Method actually followed, extent, and containment facts under at least one declared local rule. Admit the same occurrence under U.Work, then assert its typed relations. Only after admission, if precise assignment-bound attribution is current, use F.6 to relate that Work to the same assignment. Add only the actual operation binding, resource use, or Work-to-referent relation on which the receiving sentence relies. Planning may name intended performer conditions but does not backdate an A.13 assignment, agency claim, or Work occurrence.
A Work occurrence may be designated by an episteme that also cites a U.WorkPlan, exact A.15.3 planned-filling claim, or prior readiness claim as a baseline. For an operation argument or result, cite one identified A.6.1 application and its exact binding. For another participant, premise, resource use, or work-to-referent claim, name the declared predicate, participant order, and actual values; if that predicate is absent, return the corresponding missing-governor result. Do not copy a result or consequence into Work; follow the concrete §4.6 route.