Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

A.15.1:14 - Relations

  • Builds on: A.1 for the candidate occurrence’s common constructive criterion and System admission; A.2 for local agential system-role kinds and classification; A.2.1 for direct assignment species and occurrences; A.13 for the precise agency claim, characteristic profile, scope, window, and evidence; A.3.1 for U.Method; A.3.2 for U.MethodDescription; C.2.1 for episteme editions and effective reference scheme; A.2.6 for claim scope; and C.27.TA for temporal qualification.
  • Coordinates with: F.6 for attribution through the same obtaining A.13 assignment; A.15 for alignment; A.6.1 for actual bindings; A.3.4 for actual Transformations; A.15.PROD for production and inception; B.1.4 and B.1.6 for aggregation; E.10/E.10.ROLE for Agent, performer, and role wording; A.10, B.3, E.17, and A.15.4 for evidence, assurance, publication-use, and appearance-based reliance; A.15.5 for readiness; and C.32.P2S for carry-through. Permission, gate, result, production, delivery, and acceptance remain independent of Work identity.
  • Informs: reporting and KPI patterns, assurance and evidence patterns that use Work as the reference occurrence, and planning patterns that compare exact U.WorkPlan claims with independently identified Work occurrences.