| Auditable occurrence claims. Cost, time and quality accounts can refer to independently identified Work through their governing relations. | Identify the occurrence separately from the assertion or description; record creation is not occurrence creation. |
| Sound roll-up inputs. Work refs, intervals, parts, and performed resource-use facts make temporal and resource aggregation replayable. | Separate aggregation. Recover temporal aggregation in B.1.4 and work-resource aggregation in B.1.6; cite their policies and results rather than copying Gamma semantics into Work. |
| Cross-locality clarity. Method-description, scheme, scope, criterion, evaluation, and acceptance relations prevent silent meaning drift. | Bridge upkeep. Maintain F.9 Bridges only for exact local-sense crossings that a receiving use actually needs. |
| Explicit occurrence identity. Distinct parts, overlaps and retries provide the inputs needed to detect double-counting and identity errors. | Their correct use still requires the applicable identity, temporal and accounting rules. |