A.15.1:10 - Work-claim interpretation checks
When another decision relies on Work, apply only the following checks that its claims consume; reuse an established result while its basis remains applicable:
- Method-description interpretation, when used. Does
methodDescriptionRefresolve to the selectedU.MethodDescriptionepisteme under the effective reference scheme used by the receiving claim? If the claim also says this is an edition of an earlier description, does the exact C.2.1EpistemeEditionRelationobtain? If two local senses must be related, test an F.9 Bridge and state the bounded use separately rather than treating the reference change as a Bridge. - Performer and conditional assignment coverage. For every admitted
U.Systemnamed as performer, does section 4.0 recover its A.13 basis? If this receiving check expressly consumes precise assignment-bound attribution, does the account also cite the exact directly declared assignment species and the same obtaining occurrenceRAalready recovered through A.2.1 and A.13, and does F.6 obtain for the already admitted Work and thatRA? DoesRAcarry the actual participant values, have that System as holder, and cover the Work or exact performed part? If no attribution is current, stop after the performer and Work checks. If the conditional attribution branch fails, repair or reject the unsupported attribution. Retain independently grounded Work and performer claims; under §4.1, recheck any admission premise also affected by that finding. - Evaluation or acceptance, when claimed. For an evaluation, identify the criterion, its application to the required facts, the returned value and its evidence. For acceptance, identify the applicable predicate, participants and facts meeting its conditions, including any required decision or evaluation value. Identify evaluation Work separately when its dated occurrence is claimed. Historical criterion continuity requires the C.2.1 relation.
These checks tell the reader which description, assignment, criterion, evaluation, and relation to cite. They do not make acceptance part of work identity.