Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

A.1.STM:8 - Conformance checklist

IDCheck
CC-A1-STM-1Participants can recover each product SoI, its actual or proposed extended enterprise, the participating organizations’ agreements, agents’ objectives and the intended use or withdrawal from use. Bounded creation, change, sustaining in use and retirement retain their own commitments and acceptance. Local project subjects and results retain their identities and acceptance bases. In the narrower gap-finding mode, the result needed now and first unsupported dependency are readable without a technical record.
CC-A1-STM-2When the project conclusion depends on functioning at the operating time, reasoning moves from the system boundary upward to the larger functioning whole and the joint action of its parts, through the levels and supported inclusions that affect the decision. This account grounds the required function before inward construction and backward creation/provision reasoning. The practitioner identifies any conclusion that still depends on an unknown whole and uses an independently sufficient ground for the decision it settles. When choosing the model, the practitioner justifies the needed part–whole reach and model distinctions for each relevant kind, and connects their answers for the same operating situation. Transformation-flow and part–whole directions stay distinct. A proposed future use retains its assumptions; actual changes and participation require their own grounds.
CC-A1-STM-3Project SoI, current subject, required or ending use, the functioning of the remaining arrangement, any system sought by its function, selected construction and proposed or actual system remain distinguishable where they change the decision. Functional classification alone does not establish an A.2 system-role kind or an assignment. Creator contributions and the fit of concrete performers are considered separately.
CC-A1-STM-4Project Work, an admitted project-level network selection or Plain provisional map, and one minimal case placement retain their own identities.
CC-A1-STM-5The point where attention starts is connected to the order of project justification. A noticed difficulty and proactive use of the mantra can reach the same consequential question; an independent non-project inquiry keeps its own scope. Inquiry returns, Work order and obtaining subject relations retain their different meanings.
CC-A1-STM-6Each local answer states the claims and conditions needed by its receiving use, retaining the subject predicates that govern those claims and any unresolved stop. A cited pattern locates the governing content.
CC-A1-STM-7Can the recipient tell which subject or claim the closure covers, which facts and references support the conclusion, and which rule makes them sufficient? Where a use matters to the question, does the account distinguish its part in the closure decision from the grounds for an answer about the use itself? For an ordinary design inquiry, keep the question, supported answers, joint conditions and next useful action visible.
CC-A1-STM-8An admitted network has independently identified members, exact obtaining cross-member relations, applied constraints, a use frame, and complete endpoint bindings; otherwise that network proposal stays provisional. A shared systemic account does not by itself require this stronger claim.
CC-A1-STM-9Expected environmental effect, actual runtime transformation and system participation, production, identity inception, completion, later change, and use are separately grounded; required behaviour is not actuality, and no not-yet-existing system is transformed.
CC-A1-STM-10Evidence is bound to its claim, assurance is limited to a named reliance use, and changed grounds reopen only the smallest affected answer.
CC-A1-STM-11The account explains why the chosen answers can be used together under their actual shared conditions; it does not combine locally supported answers from incompatible variants.
CC-A1-STM-12The reader can follow a consequential change to the answers it affects, distinguish possible repairs and their conditions, and recover the difference between the teaching unfolding and performed Work.
CC-A1-STM-13Organizational work connects product use, needed creator capability and a finite locally accepted result under section 4.1.1. Resource choices and acceptance use that connection, including affected products, real provision and decision rights. Remaining uncertainty, research acceptance and later product-use evidence retain their own scope. A new contract or sale of the organization does not replace the product SoI.