A.1.STM:3 - The attention map
Keep these connected questions available while reasoning about the project. Begin the justification with receiving use and the wider functioning that depends, or would depend, on the system. Then examine the construction and work relevant to the undertaking. Reuse answers already sufficient for the current decision and investigate a gap where it can change that decision. The rows are reminders, not mandatory fields or work stages. One ordinary sentence can answer more than one question.
| Region | Plain question | What the answer enables |
|---|---|---|
| Outside change and use | What should become different or remain possible for whom, in which operating situation and time? | Establish the result sought, receiving transformations and success conditions, including a proposed future use. |
| Wider functioning at that time | Of which larger functioning whole is the system a part, and how does the joint action of the parts produce the result sought? | Establish the relevant part–whole relations at the operating time, moving through the levels and inclusions that affect the decision. An unknown whole leaves the conclusions that depend on it open. Keep use, interaction, ownership and creation distinct from containment. |
| Project systems-of-interest and uses | Which systems and receiving results matter to this decision, in which projects, and which boundaries and connections must the participants agree? | Connect contributions to the relevant uses and shared conditions through section 4.1. A future system can be described before an actual holder exists. |
| Functioning sought or affected | Which contribution is needed, for how long, or may now cease? | Describe a future system by its function, or locate what must continue or end in an existing arrangement. |
| Construction | Which organization, parts or materials can provide the needed functioning during the transition and afterwards? | Compare constructions and operating conditions through C.32.P2S and the C.30 family. An existing arrangement may suffice. |
| Project work | How can the required product be obtained or kept usable, or the agreed use ended with the specified conditions preserved? | Identify applicable Methods and their conditions. A.3.1 and the A.15 family distinguish the way of doing from its plan, performance and result. |
| Creator contributions and fit | What work and results do those Methods require, and which people, teams, equipment or other systems can supply them here? | Select or develop capable creators. A.2.2 compares their qualified abilities with the demand; an occupation name or assignment does not settle that comparison. |
| Cooperation and needed creators | How can the contributions be available together, and which creators must themselves be obtained or changed? | Resolve shared resources, access, authority, timing and handovers; repeat the reasoning for a missing builder while retaining the results its contribution must serve. Section 4.3 develops these connections. |
| Local result and receiving use | What is our present subject, who or what uses the result next, and how does that use serve the SoI? | Preserve a useful component, instrument, description or argument at its own scope and establish the relation the next use needs. |
| Grounds and revision | What supports the answers relied on together, what remains unknown, and what changed condition sends us back? | Use section 4.3.1 to compare whole proposals and revise affected answers. Use A.10 when evidence support is the question and B.3 for a named assurance use. |
First follow the anticipated contribution toward receiving use and examine the relevant containing whole upward, at the operating time. With that basis available, reason backward along the providing flow to what must be obtained and downward into construction to what could realize the functioning. These are two axes: a creator can provide a system without containing it. Test the proposed causal connections forward, then follow actual results as they become available. Reasoning direction, subject relations and planned or performed Work order remain distinct.
When actual relations or a network are the question. A proposal can be compared before it has been realized. An actuality claim needs the facts for that claim. For an actual runtime change, identify the environment or input referent that changed under A.3.4 separately from the existing system’s functioning, causal, interaction or participation claim. Add an assignment, Method or Work claim only when it is needed and independently supported. A required effect or an observed output alone does not establish that change or those system-side relations.
For an actual production account, distinguish Work, changes of continuing materials or parts, production participation, the new entity’s identity inception, completion and later use through A.15.PROD and the relevant subject patterns. A system cannot undergo a change before it exists. Use an available recognition result for an actual system; section 7 supplies the return when systemhood is unresolved.
When the receiving question needs a transformation-flow structure or a network of such structures, use E.18 to identify each TFS and E.18.NET for the network. The latter requires independently identified members, exact obtaining cross-member relation occurrences, complete endpoint bindings, applied constraints and the use frame. Production, operation, verification, feedback and recursive builder branches can concern different members.
A shared entity, temporal adjacency or a drawn arrow supplies no relation between them. Keep a proposed network provisional and name the missing member, governor, predicate result, occurrence or binding. An ordinary project explanation need not make this network claim.